当前位置:首页 > Information > Chinese News

Construction of subway leading to new Kunming airport launched

Source:   Time:

 
As the main structure of the terminal 1 building has been completed, construction of subway for leading to new Kunming airport has also been commenced.This subway is expected to create a connection between terminal 1 building and the ground logistics control district. The tunnel has a total length of 3208.17 meters. It is expected to be opened to traffic on May 30, 2011. [Photo Source:yunnan.cn]

As the main structure of the terminal 1 building has been completed, construction of subway for leading to new Kunming airport has also been commenced.This subway is expected to create a connection between terminal 1 building and the ground logistics control district. The tunnel has a total length of 3208.17 meters. It is expected to be opened to traffic on May 30, 2011.  [Photo Source:yunnan.cn]

As the main structure of the terminal 1 building has been completed, construction of subway for leading to new Kunming airport has also been commenced.This subway is expected to create a connection between terminal 1 building and the ground logistics control district. The tunnel has a total length of 3208.17 meters. It is expected to be opened to traffic on May 30, 2011. [Photo Source:yunnan.cn]

[Relative Articles]

Copyright Reserved 2010 © South-East Asia & South Asia Infoport  | Filing Number:ICP 09005773
Technical Support:China Basalt Software Technology Co., Ltd.